Email Address

contact@amaar.pk

Mirani Dam Project

Mirani Dam Project

Mirani-Dam-Project

Client and Owner:Water and Power Development Authority (WAPDA)
Consultant/Designer:Nespak, ACE, Binie Black & Montgomery (NEAC)
Description of Works:Engineering, Procurement, and Construction Works.
Main Components:
a) Hydrology:Catchment Area: 7,964 Sq. miles Average Annual Flow: 223,000 A. Ft.
b) Reservoir:Gross Storage: 302,000 A. Ft. Live Storage: 52,000 A. Ft. Average Annual Releases: 114,000 A. Ft.
c) Dam (Type: Earth Fill):Height: 127 Ft. Length at Crest: 3,350 Ft. Top Width: 35 Ft.
a) Hydrology:Catchment Area: 7,964 Sq. miles
d) Spillway (Type: Overflow):Clear Waterway: 344 Ft. Designed Capacity: 205,800 Cusecs Maximum Capacity: 384,300 Cusecs
e) Outlet:Tunnel Diameter: 8 Ft Capacity: 377 Cusecs
Access Road:43 Km
Irrigation System:Gravity, Lined Channels Command Area & Capacity of System Right Bank Canal: 20,800 Acres & 36 Cusecs Left Bank Canal: 12,400 Acres & 141 Cusecs Total: 33,200 Acres & 377 Cusecs
Man-hours:10.87 million
Peak manpower:1,550
Completion:July 2006

Quick Search